· 5 items
Regional Planning Commission, Wednesday, September 30
On the episode: LA County's final $54.2 billion budget, homeless families, and quake readiness
This episode was produced with AI from the public recordings of the week's meetings. Links to the sources are in the show notes.
What happened
Regional Planning Commission Wednesday, September 30
5 items
Approval of the agenda Item 5
Routine vote to adopt the day's agenda. 00:03:20
- Motion to approve the agenda (mover and seconder not identified). Result: passed, 4-0. 00:03:20
Minutes of September 2, 2026 Item 6
Routine approval of the minutes of the commission's September 2, 2026 meeting. 00:03:20
- Motion to approve the September 2 minutes (mover and seconder not identified). Result: passed, 4-0. 00:03:41
County Counsel on public comment time limits and meeting rules of conduct Item 7
Ethics and meeting rules
County Counsel followed up on a commission request about how it can manage public comment when many people sign up to speak, as happened at the previous week's meeting, and read the rules of conduct for the meeting. The guidance concerns how the commission can adjust speaking time when many people sign up. 00:03:54
- A speaker explained that under the commission's rules of procedure the time allotted to each speaker is at the commission's discretion and can be changed before or during a meeting 00:03:54
- A speaker said that at the previous week's meeting the commission could have cut speaking time from two minutes to one, or announced a cutoff for oral comment 00:03:54
- A speaker advised that if oral comment is capped, the secretary or chair should announce how remaining online speakers can submit comments by email or in writing 00:04:58
- Elvin Moon (Commissioner; Chair) asked whether changing the procedure requires a vote 00:05:44
- A speaker answered that it takes a motion and a majority vote, though not necessarily a roll-call vote 00:05:53
- Elvin Moon (Commissioner; Chair) read the rules of conduct, saying disruptive speakers can lose the right to speak and online participants can have microphones disabled or be disconnected 00:06:14
- A commissioner said on arriving late that she had listened to the hearing on the way and did not need to be briefed on County Counsel's remarks 00:30:45
Topanga ridgeline home variance appeal continued again Item 11
Development projects
An appeal by the Las Virgenes Homeowners Federation of a Hearing Officer's June 24, 2025 approval of a variance to build a new 4,000-square-foot single-family home on a mapped significant ridgeline at 2354 Topanga Canyon Boulevard in the Santa Monica Mountains Planning Area (agenda). The item has been continued repeatedly without the hearing being opened. Staff recommended another continuance at the applicant's request, and the commission continued it to January 13, 2027. 00:10:40
- A commissioner moved to follow the staff recommendation to continue the item; seconded (seconder not identified). Result: continued, 4-0. 00:11:21
- County staff said staff recommended a continuance at the applicant's request 00:10:52
Altadena McDonald's rebuild after the Eaton Fire approved Item 12
Development projectsDisaster recovery
McDonald's Corporation asked for a conditional use permit to rebuild its drive-through restaurant at 1306 North Altadena Drive in unincorporated Altadena, at the corner of Washington Boulevard. The old 2,277-square-foot building was damaged in the Eaton Fire and demolished. The plan replaces it with a 4,142-square-foot building and expands the drive-through from one lane to two. A minor parking deviation cuts required parking from 24 spaces to 17. The commission had continued the item from its June 24, 2026 hearing and told the applicant to redesign the freestanding sign so no variance was needed, and to keep working with staff on the facade and on adding a mural or other art. The approval allows parking between the building and the sidewalk, which staff called not pedestrian-friendly. It also lets the restaurant keep opening at 5 a.m., earlier than the 6 a.m. limit in the Altadena Community Standards District. Staff will negotiate the final design of the art panels and mural after the vote. 00:11:33
- A commissioner moved to close the public hearing and find the project exempt under state and local CEQA guidelines; seconded (seconder not identified). Result: passed, 5-0. 00:31:08
- A commissioner moved to approve Conditional Use Permit No. RPPL2023004561 and Minor Parking Deviation No. RPPL2023004570, subject to the attached findings and conditions; seconded (seconder not identified). Result: passed, 5-0. 00:31:36
- County staff described the request, including a minor parking deviation reducing required parking by 30 percent, from 24 spaces to 17 00:11:46
- County staff said the previous 2,277-square-foot building was damaged in the Eaton Fire and demolished, and the site is now vacant 00:12:50
- County staff said the plan is a single-story 4,142-square-foot restaurant with two drive-through lanes 00:12:50
- County staff said the applicant redesigned the freestanding sign to five feet tall and 30 square feet, within the Altadena standards, so no variance is needed 00:13:54
- County staff said the applicant voluntarily redesigned the facade, adding artistic perforated metal panels on parts of the west and east walls and a mural on a three-foot screening fence facing Altadena Drive 00:13:54
- County staff said the permit includes four modifications to the West San Gabriel Valley Planning Area Standards District and the Altadena CSD, one allowing parking between the building and the sidewalk 00:16:07
- County staff said the Altadena CSD bars drive-through hours before 6 a.m., but the restaurant historically ran from 5 a.m. to midnight and asked to keep those hours 00:18:10
- County staff said the Altadena Town Council recommended approval as long as the historical hours stay the same and do not expand 00:18:10
- County staff said fire flow testing showed the existing hydrant meets standards, so the fire department dropped its condition requiring a new public hydrant and issued a revised letter that morning 00:19:13
- A commissioner asked staff to confirm the town council supports keeping the historical hours 00:20:23
- The applicant's representative said the business burned in the Eaton Fire, McDonald's accepts the revised conditions, and it wants to start construction as soon as possible 00:21:02
- Michael Hastings (Commissioner) said he supports the project but was bothered that the applicant was not there in person, and that he did not understand the metal panel design 00:21:59
- The applicant's architect said the design team chose perforated metal panels for added detail and to get the building design staff wanted 00:24:23
- The applicant's representative said the panels cover most of the west side but less than half of the drive-through east side, and argued a mural on the building would have worked against its design 00:25:09
- A commissioner raised concerns, from past projects, that perforated metal panels cause problems with upkeep, graffiti, cleaning and birds, and asked staff to make sure they won't become an eyesore 00:26:37
- County staff said the panel plans are only a placeholder and the final design will be negotiated after the vote, given the urgency of disaster recovery 00:27:14
- County staff said new condition 27 requires a revised exhibit covering things like materials and maintenance, and staff may ask for changes to the Golden Arches sign on the east wall, or its removal 00:28:16
- County staff said the conditions require graffiti removal within 48 hours and replacement of damaged panels within 30 days of notice, and invited the commission's input on adding to them 00:28:16
- A commissioner repeated his support and asked staff to look at problems from a past project with bird nesting, filth and graffiti so the same doesn't happen in Altadena 00:29:39
Public comment
- One member of the public spoke during general public comment on topics not on the agenda. He described coordinating with a USC student government on workforce and economic development workshops for an incentive zone in City of Los Angeles council districts 8, 11 and 15, mentioned meeting a Port of Los Angeles real estate coordinator, and called for reviewing Cold War-era surveillance infrastructure in the Pacific.
- No members of the public spoke on item 12 (the Altadena McDonald's).
What's next
- Item 11 (Topanga Canyon ridgeline home variance appeal) is continued to January 13, 2027.
- The last day to file an appeal of the Altadena McDonald's approval (item 12) is October 14, 2026.
- Under new condition 27, the final design of the Altadena McDonald's perforated metal panels must be reviewed and approved by the director of LA County Planning; condition 28 covers the mural. Staff said it may also ask for changes to the Golden Arches sign on the east wall, or its removal.
- County Counsel was asked to brief the commissioner who arrived late on the public comment guidance after the meeting. She later said she had heard it while traveling and did not need a briefing.
- The commission adjourned to Wednesday, October 7, 2026 at 9:00 a.m.
Write to the Regional Planning Commission before its next meeting: comment@planning.lacounty.gov